There has been a lot of progress downstairs since I have last posted photos. Here are some accomplishments over the last month or so. The oak has been installed on the stairs!
John and I put the slate down in front of the back door.

I love that there is a toilet outside the window in this shot!

The plumbing was inspected and approved. John put in the tub and did the drywall, mud, paint etc!